Additional cost for 6 tall x 18 wide curb with small gutter feature.
How to stake curb and gutter.
A stake marked c 3 2 48 2 means that the stake is 48 2 feet from the centerline and the ground at the stake is 3 2 feet.
The surveyor should follow these steps when staking curb gutter curb and gutter or barrier wall.
The stake is driven so that it slopes away from the fill or cut and is marked with its horizontal distance left or right from the centerline and the vertical distance from the ground at the stake to the finish elevation.
In a curb and gutter that settles tilts or cra c k s.
Concrete curb and gutter installation equipment allowance job related costs of specialty equipment used for job quality and efficiency including.
Additional cost for gutter net 6 tall x 24 base for higher volume drainage.
48 bull float reinforcing bar cutters 5 cubic foot mixing box with mortar hoe.
It also involves placing stakes in the field that mark the location and elevation of proposed grades detention ponds utility structures curb and gutter buildings or any other improvements as shown on the approved engineering design drawing or architectural plans.
The staking contractor must always consult with the curb gutter curb and gutter or concrete barrier wall contractor and check with engineer for changes to the approved plans before doing any staking or grade computations.
Item unit cost quantity line cost.
The curb constructors obtain their line and grade from offset hubs like those described previously.
This re i n f o r cement is con tinuous through contraction joints but stops at expan sion joints.
Perimeter form boards and stakes.